Skip to main content
Site logo

Main navigation

  • Home
  • About Dominic
  • News
  • My Plan
  • Dominic's Newsletter
  • Rail Survey
  • Contact
Site logo

New Bridge Coming to Walton Station

  • Tweet
Friday, 18 November, 2022
Walton Station Bridge

I have been campaigning for improved station accessibility at local train stations across Esher and Walton constituency.

I am pleased to see that progress is underway at Walton Station to build a new footbridge with lifts. This will really help people in wheelchairs, or those with heavy luggage, get from one side of the station to the other.

The main works will be taking place over the Christmas period to limit disruption as much as possible. The bridge will hopefully be in full service by Spring 2023.

These improvements are being funded by the government’s £390 million ‘Access for All’ Scheme.

You can see above the first artistic impression of what it will look like once complete!

There is still time to fill out my rail survey and have your say on rail improvements across Esher and Walton constituency: https://www.thedominicraab.blog/railsurvey.

  • Local News

You may also be interested in

Claygate Railway Station Footbridge Closure

Claygate Railway Station Footbridge Closure

Monday, 13 March, 2023

Recently Network Rail engineers were conducting strengthening works and safety checks on the footbridge at Claygate Railway Station. Whilst conducting these works, faults with the structure were identified that required Network Rail to put the bridge under an emergency closure.

Show only

  • Local News
  • Westminster News

Dominic Raab MP for Esher and Walton

Footer

  • About RSS
  • Accessibility
  • Cookies
  • Privacy
  • About Dominic
ConservativesPromoted by Suzi Coul on behalf of Dominic Raab, both at 3 Bridle Close, Kingston on Thames, KT1 2JW

You can see older news items and blog posts from Dominic's old website here

Copyright 2023 Dominic Raab MP for Esher and Walton. All rights reserved.
Powered by Bluetree